Legacy software modernization, one working piece at a time.
We move old business systems onto platforms that are still supported, without stopping the business that runs on them. The work is done in stages. The old and new systems run side by side, the figures are compared, and you sign off the comparison before anything is switched off.
- OOrdersSwitched, old screens retired
- SStockSwitched, figures signed off
- IInvoicingOld and new compared every night
- PPayrollNext, after the year-end run
Legacy software modernization: what it is
Legacy software modernization is the process of moving an old business system onto technology that is still supported and maintainable, while keeping the business rules the system contains.
Trusted by 500+ Clients
What legacy software modernization really means.
Legacy software is software your business depends on that has become hard to change. The language or database is out of support, the people who wrote it have left, it will not run on a current server, or every small change breaks something else. It still does its job, which is why it is still there.
Legacy software modernization is the work of moving that system onto technology that is supported and that today's engineers can maintain, while keeping the rules the business has built into it over the years. The hard part is seldom the new code. It is finding out what the old system really does, including the rules nobody wrote down.
Most failed modernization projects fail the same way: a full rewrite, a single switch-over date, and a discovery in the final month that the new system gets a different answer from the old one. We work the other way. One part moves at a time, both systems run together, and the numbers are compared until they agree.
What separates a safe modernization from a rewrite.
Four practices we hold to on every modernization project, whatever the size of the system.
We read the system before we quote
A paid assessment comes first. We go through the code, the database and the jobs that run overnight, and talk to the people who use it. You get a map of what the system does, what is risky and what can be left alone.
One part moves at a time
The new system grows around the old one. Each part is moved, proved and switched on its own, so the business never depends on a single weekend going well.
The figures are reconciled before the switch
Old and new run side by side on the same data. Totals, balances and reports are compared, differences are explained, and you sign the reconciliation report before the old part is retired.
We tell you when not to replace
Some old systems are stable, cheap to run and understood by the people who use them. If the honest answer is to leave it, put a modern interface in front of it or move it to a new server unchanged, that is what we recommend.
How a modernization project runs.
Four steps. The first is a fixed-price assessment that you can use with any supplier.
Assess
We read the code and data, list every function, interface and scheduled job, and rate each by business value and risk. The result is a written report with a recommended route and a staged plan.
Choose the route
For each part we agree one route: keep, move to new infrastructure unchanged, restructure the code, rebuild, or replace with a packaged product. Few systems need the same route for every part.
Move and compare
Each part is built or moved, loaded with real data and run beside the old one. Automated tests capture how the old system behaves so the new one can be checked against it.
Switch and retire
After you sign the reconciliation, users move to the new part and the old one is switched off. The last step of the project is turning off the old server, with its data archived where you can still read it.
Modernization services we provide.
From a first assessment to retiring the last old server. Take the whole service or the part you need.
Legacy system assessment
A written review of the code, data, interfaces and running costs, with the risks ranked and a staged plan you can act on.
Move to cloud or new servers
The system is moved off hardware or an operating system that is out of support, unchanged where that is safe, so the urgent risk goes first.
Code restructuring
The existing code is cleaned up, upgraded to a supported version and covered with tests, without changing what it does.
Rebuild on a current platform
Parts that cannot be saved are rebuilt, with the old rules carried over and the old behaviour used as the test.
Database migration
Data moved to a supported database, with cleaning, mapping and a count-and-total check on every table.
Interface renewal
Old desktop and terminal screens replaced with a web or mobile interface, while the system behind them stays in place.
Integration layer
Connections added so the old system can share data with newer software, which often removes the need to replace it yet.
Support during the move
We keep the old system running and fixed while the new one is built, so one team answers for both.
Why choose Moweb as your modernization company.
What to expect from us, and what we will not promise.
We maintain other people's systems
Taking over and supporting software that another supplier wrote is regular work for us. Reading unfamiliar code and keeping it alive is the same skill a modernization needs.
Proof in numbers, signed by you
Every stage ends with a reconciliation report comparing old and new. Nothing is retired on our say-so.
Certified security and process
Moweb is ISO 27001:2022 certified and CMMI Level 3 appraised. Access to your code and production data is limited, logged and removed at the end.
No savings figure we cannot show
We do not quote a percentage saving before we have seen your system. The assessment measures your own costs, and the plan is built on those.
Old systems we are asked to modernize.
When to leave a legacy system alone.
Age is no reason to replace software. If a system is stable, cheap to run, safe from outside access and understood by its users, replacing it buys risk and little else. A good assessment often ends with a short list: fix these two risks, add one connection, and look again in two years.
Modernization earns its cost when the system blocks something the business needs, when it can no longer be patched against security faults, when only one person can change it, or when it will not survive the next server or operating system upgrade.
Built with the right tools.
Production-grade technology, chosen to fit your stack and constraints.
Questions about Legacy Software Modernization.
What teams ask before they start.
- 01
What is legacy software modernization?
Legacy software modernization is the process of moving an old business system onto technology that is still supported and maintainable, while keeping the business rules it contains. It ranges from moving the system to new servers unchanged to rebuilding it completely.
- 02
How do we choose between legacy software modernization companies?
Ask each company how they will prove the new system gives the same answers as the old one, and whether the old system stays available until you sign that proof off. Ask whether they have maintained software written by others. A company that proposes a full rewrite before reading your code is guessing.
- 03
How much does legacy modernization cost?
It depends on the size of the system, the route chosen for each part and the state of the code. We start with a fixed-price assessment, and its report includes a staged plan with a price for each stage, so you can stop after any stage.
- 04
How long does it take?
The assessment usually takes two to four weeks. After that, each stage is planned to finish in a few weeks to a few months, and the system as a whole can take from a few months to more than a year. You have working, switched-over parts long before the end.
- 05
Will the business have to stop during the move?
No. The old system keeps running until each new part has been proved beside it. The switch for each part is planned for a quiet period, and the old part can be brought back if something unexpected appears.
- 06
Should we rewrite or restructure?
Restructure when the code is sound but dated, and rebuild when it cannot be made safe or nobody can understand it. Most systems need a mix. The assessment decides this part by part, with the reasons written down.
- 07
What if there is no documentation and the original developers have left?
That is the normal case. We work from the code, the database and the people who use the system, and write tests that record what it does today. Those tests become the specification for the new system.
- 08
Can you use AI to speed up modernization?
Yes, for reading and explaining old code, drafting tests and translating simple code. It makes the reading stage faster. An engineer reviews everything it produces, and the reconciliation of old and new figures is never left to a model.
- 09
What happens to our old data?
Data that is still in use is moved and checked table by table. Older data is either moved as well or archived in a form you can still open and search. Nothing is deleted without your written decision.
- 10
Can you modernize a system another company built?
Yes. Most systems we are asked to modernize were built by someone else. We need access to the code, the database and a test copy of the system to begin.
Proof
Work we have shipped.
Start with an assessment of your old system.
Tell us what the system does, what it is written in and what worries you about it. We will propose a fixed-price assessment and tell you what its report will contain.
Not ready to talk? Find the right modernization route